Showing 1 - 1 of 1
In the construction industry demand drives the design process and as a result design is structured in order to respond to this demand. However, what happens when this demand breaks down, when traditional markets are saturated, and no feasible alternative arises? Will this sector be capable of...
Persistent link: https://www.econbiz.de/10005269054