We investigate the single machine scheduling problem with job release dates and due dates, and multiple planned unavailability time periods. This problem arises in the context of machine scheduling with planned preventive maintenance and might be viewed as a generalisation of several fundamental...
Persistent link: https://www.econbiz.de/10011266509
This paper investigates how to adapt some discrepancy-based search methods to solve Hybrid Flow Shop (HFS) problems in which each stage consists of several identical machines operating in parallel. The objective is to determine a schedule that minimises the makespan. We present here an...
Persistent link: https://www.econbiz.de/10005754441
This paper investigates how to adapt some discrepancy-based search methods to solve Hybrid Flow Shop (HFS) problems in which each stage consists of several identical machines operating in parallel. The objective is to determine a schedule that minimises the makespan. We present here an...
Persistent link: https://www.econbiz.de/10008563608
Efficient production resettings are necessary to achieve production flexibility. For this reason, it is of primary importance to reduce the setup time required to switch the production from one product type to another, and more generally to minimise the loss of production during these resetting...
Persistent link: https://www.econbiz.de/10010754858