Showing 1 - 10 of 11
We consider the NP-hard problem of scheduling n jobs in m two-stage parallel flow shops so as to minimize the makespan. This problem decomposes into two subproblems: assigning the jobs to parallel flow shops; and scheduling the jobs assigned to the same flow shop by use of Johnson’s rule. For...
Persistent link: https://www.econbiz.de/10010577572
We analyze the performance of the greedy algorithm for the on-line two-machine open shop scheduling problem of minimizing makespan, in which time lags exist between the completion time of the first and the start time of the second operation of any job. The competitive ratio for the greedy...
Persistent link: https://www.econbiz.de/10008483305
Persistent link: https://www.econbiz.de/10005151622
Persistent link: https://www.econbiz.de/10005283682
Mathematical programming representation has been recently used to describe the behavior of discrete event systems as well as their formal properties. This new way of representing discrete event systems paves the way to the creation of simpler mathematical programming models that reduce the...
Persistent link: https://www.econbiz.de/10010871073
The x-and-y-axes travelling salesman problem forms a special case of the Euclidean TSP, where all cities are situated on the x-axis and on the y-axis of an orthogonal coordinate system of the Euclidean plane. By carefully analyzing the underlying combinatorial and geometric structures, we show...
Persistent link: https://www.econbiz.de/10011052749
Persistent link: https://www.econbiz.de/10005240084
Persistent link: https://www.econbiz.de/10005253011
Persistent link: https://www.econbiz.de/10005257243
Persistent link: https://www.econbiz.de/10005284052