Showing 1 - 6 of 6
Persistent link: https://www.econbiz.de/10005151329
Persistent link: https://www.econbiz.de/10005095078
This paper addresses a problem arising in the coordination between two consecutive departments of a production system, where parts are processed in batches, and each batch is characterized by two distinct attributes. Due to the lack of interstage buffering between the two stages, these...
Persistent link: https://www.econbiz.de/10005240484
This paper addresses a practical scheduling problem arising in the packaging department of a pharmaceutical industrial plant. The problem is modeled as a multi-purpose machine scheduling problem with setup and removal times, release and due dates and additional constraints related to the scarce...
Persistent link: https://www.econbiz.de/10008483322
This paper addresses a scheduling problem arising in the real time management of a metro rail terminus. It mainly consists in routing incoming trains through the station and scheduling their departures with the objective of optimizing punctuality and regularity of train service. The purpose of...
Persistent link: https://www.econbiz.de/10005347305
Persistent link: https://www.econbiz.de/10005278187