Showing 1 - 5 of 5
The classical multi-level capacitated lot-sizing problem formulation is often not suitable to correctly capture resource requirements and precedence relations. Depending on lead time assumptions, either the model provides infeasible production plans or plans with costly needless inventory. We...
Persistent link: https://www.econbiz.de/10011117496
Solving multi-level capacitated lot-sizing problems is still a challenging task, in spite of increasing computational power and faster algorithms. In this paper a new approach combining an ant-based algorithm with an exact solver for (mixed-integer) linear programs is presented. A MAX-MIN ant...
Persistent link: https://www.econbiz.de/10005023421
We present a novel mathematical model and a mathematical programming based approach to deliver superior quality solutions for the single machine capacitated lot sizing and scheduling problem with sequence-dependent setup times and costs. The formulation explores the idea of scheduling products...
Persistent link: https://www.econbiz.de/10010679122
In this paper, we investigate a two-stage lot-sizing and scheduling problem in a spinning industry. A new hybrid method called HOPS (Hamming-Oriented Partition Search), which is a branch-and-bound based procedure that incorporates a fix-and-optimize improvement method is proposed to solve the...
Persistent link: https://www.econbiz.de/10010730169
Several production environments require simultaneous planing of sizing and scheduling of sequences of production lots. Integration of sequencing decisions in lotsizing and scheduling problems has received an increased attention from the research community due to its inherent applicability to...
Persistent link: https://www.econbiz.de/10010906813