Showing 1 - 8 of 8
Persistent link: https://www.econbiz.de/10005277690
Persistent link: https://www.econbiz.de/10005329762
This paper examines a resource constrained production planning and scheduling problem motivated by the coal supply chain. In this problem, multiple independent producers are connected with a resource availability (or, linking) constraint. A general description of such problems is provided,...
Persistent link: https://www.econbiz.de/10011097779
Persistent link: https://www.econbiz.de/10005287888
Winter road maintenance operations involve a host of decision-making problems at the strategic, tactical, operational, and real-time levels. Those operations include spreading of chemicals and abrasives, snow plowing, loading snow into trucks, and hauling snow to disposal sites. In this paper,...
Persistent link: https://www.econbiz.de/10005240399
Persistent link: https://www.econbiz.de/10005278008
We introduce a class of incremental network design problems focused on investigating the optimal choice and timing of network expansions. We concentrate on an incremental network design problem with shortest paths. We investigate structural properties of optimal solutions, show that the simplest...
Persistent link: https://www.econbiz.de/10010871257
The Hunter Valley Coal Chain is the largest coal export operation in the world with a throughput in excess of 100 million tonnes per annum (Mtpa). Coal is delivered to the shipping terminal from 40 mines using 27 coal load points spread across the Hunter Valley region. This paper describes an...
Persistent link: https://www.econbiz.de/10010597600