Showing 1 - 10 of 10
In the field of after sales service logistics for capital goods, generally, METRIC type methods are used to decide where to stock spare parts in a multi-echelon repair network such that a target availability of the capital goods is achieved. These methods generate a trade-off curve of spares...
Persistent link: https://www.econbiz.de/10010597595
The level of repair analysis (LORA) gives answers to three questions that are posed when deciding on how to maintain capital goods: (1) which components to repair upon failure and which to discard, (2) at which locations in the repair network to perform each type of repairs, and (3) at which...
Persistent link: https://www.econbiz.de/10008865168
Motivated by real-life spare parts networks, we introduce a new spare parts inventory model with lateral transshipment. We consider a multi-item, multi-location, single-echelon system with base stock control and aggregate mean waiting time constraints. The local warehouses are divided into two...
Persistent link: https://www.econbiz.de/10004973521
We consider an OEM who is responsible for the availability of her systems in the field through performance-based contracts. She detects that a critical reparable component in her systems has a poor reliability performance. She decides to improve its reliability by a redesign of that component...
Persistent link: https://www.econbiz.de/10011264303
We develop a delay time model (DTM) to determine the optimal maintenance policy under a novel assumption: postponed replacement. Delay time is defined as the time lapse from the occurrence of a defect up until failure. Inspections can be performed to monitor the system state at non-negligible...
Persistent link: https://www.econbiz.de/10011052446
We consider a continuous-time, single-echelon, multi-location inventory model with Poisson demand processes. In case of a stock-out at a local warehouse, a demand can be fulfilled via a lateral transshipment (LT). Each warehouse is assigned a pre-determined sequence of other warehouses where it...
Persistent link: https://www.econbiz.de/10010574202
We introduce a quantitative model to support the decision on the reliability level of a critical component during its design. We consider an OEM who is responsible for the availability of its systems in the field through service contracts. Upon a failure of a critical part in a system during the...
Persistent link: https://www.econbiz.de/10008494768
Persistent link: https://www.econbiz.de/10005236866
The present literature survey focuses on the stochastic economic lot scheduling problem (SELSP). The SELSP deals with the make-to-stock production of multiple standardized products on a single machine with limited capacity under random demands, possibly random setup times and possibly random...
Persistent link: https://www.econbiz.de/10008865382
We study real-time demand fulfillment for networks consisting of multiple local warehouses, where spare parts of expensive technical systems are kept on stock for customers with different service contracts. Each service contract specifies a maximum response time in case of a failure and hourly...
Persistent link: https://www.econbiz.de/10010662500