Showing 1 - 4 of 4
We consider bicriteria scheduling on identical parallel machines in a nontraditional context: jobs belong to two disjoint sets, and each set has a different criterion to be minimized. The jobs are all available at time zero and have to be scheduled (non-preemptively) on m parallel machines. The...
Persistent link: https://www.econbiz.de/10004973519
In this work, the problem of allocating a set of production lots to satisfy customer orders is considered. This research is of relevance to lot-to-order matching problems in semiconductor supply chain settings. We consider that lot-splitting is not allowed during the allocation process due to...
Persistent link: https://www.econbiz.de/10008494789
In this paper, we suggest a methodology to solve a cooperative transportation planning problem and to assess its performance. The problem is motivated by a real-world scenario found in the German food industry. Several manufacturers with same customers but complementary food products share their...
Persistent link: https://www.econbiz.de/10011052533
In this paper, we extend the vehicle routing problem with clustered backhauls (VRPCB) to an integrated routing and three-dimensional loading problem, called VRPCB with 3D loading constraints (3L-VRPCB). In the VRPCB each customer is either a linehaul or a backhaul customer and in each route all...
Persistent link: https://www.econbiz.de/10011190753