Showing 1 - 6 of 6
In this paper, no-wait job shop problems with makespan minimization are considered. It is well known that these problems are strongly NP-hard. The problem is decomposed into the sequencing and the timetabling components. Shift timetabling is developed for the timetabling component. An effective...
Persistent link: https://www.econbiz.de/10004973500
Persistent link: https://www.econbiz.de/10005095016
For the no-wait flowshop scheduling problem with maximum lateness criterion, properties are developed to speed up three kinds of basic operations generating candidate solutions, i.e., the insertion of a new job into a partial sequence, and the insertion and exchange neighborhood moves. The...
Persistent link: https://www.econbiz.de/10008494763
In this paper, a HGA (hybrid genetic algorithm) is proposed for permutation flowshop scheduling problems (PFSP) with total flowtime minimization, which are known to be NP-hard. One of the chromosomes in the initial population is constructed by a suitable heuristic and the others are yielded...
Persistent link: https://www.econbiz.de/10005158584
Persistent link: https://www.econbiz.de/10005271568
Real world manufacturing systems are usually constrained by both machine and human resources. Human operators are often the constraining resource and transfer between workstations to process jobs when required. This kind of system is known as a Dual Resource Constrained (DRC) system and presents...
Persistent link: https://www.econbiz.de/10009275149