The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted...
Persistent link: https://www.econbiz.de/10008865188
This paper focuses on single machine scheduling subject to inventory constraints. Jobs either add items to an inventory or remove items from that inventory. Jobs that have to remove items cannot be processed if the required number of items is not available. We consider scheduling problems on a...
Persistent link: https://www.econbiz.de/10008865209
A single round robin tournament (RRT) consists of a set T of n teams (n even) and a set P of n - 1 periods. The teams have to be scheduled such that each team plays exactly once against each other team and such that each team plays exactly once per period. In order to establish fairness...
Persistent link: https://www.econbiz.de/10005240208
Single round robin tournaments are a well known class of sports leagues schedules. We consider leagues with a set T of n teams where n is even. Costs are associated to each possible match. The goal is to find the minimum cost tournament among those having the minimum number of breaks. We pick up...
Persistent link: https://www.econbiz.de/10005277721
The capacity of a runway system represents a bottleneck at many international airports. The current practice at airports is to land approaching aircraft on a first-come, first-served basis. An active rescheduling of aircraft landing times increases runway capacity or reduces delays. The problem...
Persistent link: https://www.econbiz.de/10011190754
In a mixed-model assembly line, varying models of the same basic product are to be produced in a facultative sequence. This results to a short-term planning problem where a sequence of models is sought which minimizes station overloads. In practice - e.g. the final assembly of cars - special...
Persistent link: https://www.econbiz.de/10005337428
Assembly line balancing problems (ALBPs) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing products among the work stations along the line. On the one hand, research has focussed on developing effective...
Persistent link: https://www.econbiz.de/10005023390
At rail-road transshipment yards, gantry cranes move containers from freight trains to trucks and vice versa. They constitute important entities in today's intermodal transportation systems. Real-world yards are often partitioned into several disjunct crane areas, so that crane interferences...
Persistent link: https://www.econbiz.de/10008551285
This paper presents novel approaches for generating sequencing rules for the car sequencing (CS) problem in cases of two and multiple processing times per station. The CS problem decides on the succession of different car models launched down a mixed-model assembly line. It aims to avoid work...
Persistent link: https://www.econbiz.de/10008494796
In recent years, more and more automobile producers adopted the supermarket-concept to enable a flexible and reliable Just-in-Time (JIT) part supply of their mixed-model assembly lines. Within this concept, a supermarket is a decentralized in-house logistics area where parts are intermediately...
Persistent link: https://www.econbiz.de/10010577566