Showing 1 - 4 of 4
The economic and economic-statistical designs of an X¯ control chart for two-identical unit series systems with condition-based maintenance is studied in this paper. This system is described using a five-state continuous time Markov chain. We assume that the system is monitored by an X¯...
Persistent link: https://www.econbiz.de/10011052468
This paper analyzes a phase-type geometric process repair model with spare device procurement lead time and repairman’s multiple vacations. The repairman may mean here the human beings who are used to repair the failed device. When the device functions smoothly, the repairman leaves the system...
Persistent link: https://www.econbiz.de/10011052544
Persistent link: https://www.econbiz.de/10005253933
Persistent link: https://www.econbiz.de/10005257177