Showing 1 - 3 of 3
We consider an n-job, m-machine lot-streaming problem in a flowshop with equal-size sublots where the objective is to minimize the total weighted earliness and tardiness. To solve this problem, we first propose a so-called net benefit of movement (NBM) algorithm, which is much more efficient...
Persistent link: https://www.econbiz.de/10005337086
This paper considers a scheduling problem with two identical parallel machines. One has unlimited capacity; the other can only run for a fixed time. A given set of jobs must be scheduled on the two machines with the goal of minimizing the sum of their completion times. The paper proposes an...
Persistent link: https://www.econbiz.de/10005240522
Persistent link: https://www.econbiz.de/10005329847