Showing 1 - 10 of 14
The transportation processes for patients, personnel, and material in large and complex maximum-care hospitals with many departments can consume significant resources and thus induce substantial logistics costs. These costs are largely determined by the allocation of the different departments...
Persistent link: https://www.econbiz.de/10010784202
We present a detailed analysis of the patient and resource scheduling problem in rehabilitation hospitals. In practice, the predominantly therapeutical treatments and activities which are prescribed for the patients are typically scheduled manually. This leads to rigid and inefficient schedules...
Persistent link: https://www.econbiz.de/10008679067
This paper presents a linear programming approach to analyze and optimize flow lines with limited buffer capacities and stochastic processing times. The basic idea is to solve a huge but simple linear program that models an entire simulation run of a multi-stage production process in discrete...
Persistent link: https://www.econbiz.de/10005464765
In stochastic lot sizing subject to dynamic and random demand, the minimization of operational costs is not the only conceivable objective. Minimizing the tardiness in customer demand satisfaction is no less important. Furthermore, the decision maker is interested in production plan stability....
Persistent link: https://www.econbiz.de/10014471643
Long-term throughput, as a key performance indicator of a stochastic flow line, is affected by numerous parameters describing the features of the flow line, such as processing time and buffer size. Fast and accurate evaluation methods for a given set of values for those parameters are a...
Persistent link: https://www.econbiz.de/10014471646
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011776698
This paper presents an optimization-based solution approach for the dynamic multi-level capacitated lot sizing problem (MLCLSP) with positive lead times. The key idea is to solve a series of mixed-integer programs in an iterative fix-and-optimize algorithm. Each of these programs is optimized...
Persistent link: https://www.econbiz.de/10005405281
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10005464735
This paper presents a profit-oriented shift scheduling approach for inbound contact centers. The focus is on systems in which multiple agent classes with different qualifications serve multiple customer classes with different needs. We assume that customers are impatient, abandon if they have to...
Persistent link: https://www.econbiz.de/10005464785
In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally...
Persistent link: https://www.econbiz.de/10010769221