In a deterministic project network, all the activity times are fixed values and the path float can be found by computing the difference between the project duration and the path length. This is not possible in its stochastic counterpart, where the path lengths and the project duration change...
Persistent link: https://www.econbiz.de/10010816720
The current paper aims to examine strategic predictions (with forecast horizons greater than six months) via the empirical probability (EP) technique. This technique was proposed initially to examine short-term tactical predictions (with forecast horizons less than three months), as set out in...