Showing 1 - 10 of 14
Humanitarian organizations pre-position relief items in pre-disaster and distribute them to the affected areas in post-disaster. Improper planning of emergency operations causes more deaths in post-disaster. In this paper, the problem of relief item pre-positioning and multi-period distribution...
Persistent link: https://www.econbiz.de/10013470816
In this paper, we apply continuous review (S-1, S) policy for inventory control in a three-echelon supply chain (SC) including r identical retailers, a central warehouse with limited storage space, and two independent manufacturing plants which offer two kinds of product to the customer. The...
Persistent link: https://www.econbiz.de/10011551806
Machines are a key element in the production system and their failure causes irreparable effects in terms of cost and time. In this paper, a new multi-objective mathematical model for dynamic cellular manufacturing system (DCMS) is provided with consideration of machine reliability and...
Persistent link: https://www.econbiz.de/10013470765
It is observed that the separated design of location for depots and routing for servicing customers often reach a suboptimal solution. So, solving location and routing problem simultaneously could achieve better results. In this paper, waste collection problem is considered with regard to...
Persistent link: https://www.econbiz.de/10011773037
Today competitive environment has enforced practitioners and researchers to pay great attention to issues enhancing both production and marketing competitiveness. To do so, it has been obligatory for the firms to consider production side activities while customer requirements are on the other...
Persistent link: https://www.econbiz.de/10011640813
Due to the depletion of the fossil fuels and major concerns about the security of energy in the future to produce fuels, the importance of utilizing the renewable energies is distinguished. Nowadays there has been a growing interest for biofuels. Thus, this paper reveals a general optimization...
Persistent link: https://www.econbiz.de/10011640887
Mixed-model assembly lines are increasingly accepted in many industrial environments to meet the growing trend of greater product variability, diversification of customer demands, and shorter life cycles. In this research, a new mathematical model is presented considering balancing a mixed-model...
Persistent link: https://www.econbiz.de/10011640923
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of...
Persistent link: https://www.econbiz.de/10010317844
A vehicle routing problem is a significant problem that has attracted great attention from researchers in recent years. The main objectives of the vehicle routing problem are to minimize the traveled distance, total traveling time, number of vehicles and cost function of transportation. Reducing...
Persistent link: https://www.econbiz.de/10010317854
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is...
Persistent link: https://www.econbiz.de/10010317862