Showing 1 - 1 of 1
This paper examines an important scheduling problem resulting from a new process for continuously casting steel. A master slab caster produces slabs which are wider than customer needs, and therefore, these must be ripped longitudinally at least once before they can be processed to a...
Persistent link: https://www.econbiz.de/10009197677