We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially renewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make,...
Persistent link: https://www.econbiz.de/10009191542
We consider the resource-constrained project scheduling problem. The purpose of this paper is to direct the focus to a branch-and-bound concept that can, by simple adaptations, operate on a wide range of problem settings. The general approach can, e.g., deal with multimode problems, resource...
Persistent link: https://www.econbiz.de/10009197319
Management of projects is complicated by the scarcity of resources required to execute them. Limited resources usually extend the project completion times beyond those determined by CPM/PERT. Several solution procedures have been developed for solving the resource constrained project scheduling...
Persistent link: https://www.econbiz.de/10009214245
Resource-constrained project scheduling with generalised precedence constraints is a very general scheduling model with applications in areas such as make-to-order production planning. We describe a time-oriented branch-and-bound algorithm that uses constraint-propagation techniques which...
Persistent link: https://www.econbiz.de/10009214375
In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in...
Persistent link: https://www.econbiz.de/10009214730
In this paper a branch-and-bound procedure is described for scheduling the activities of a project of the PERT/CPM variety subject to precedence and resource constraints where the objective is to minimize project duration. The procedure is based on a depth-first solution strategy in which nodes...
Persistent link: https://www.econbiz.de/10009198063
In this paper we consider the Project Scheduling Problem with resource constraints, where the objective is to minimize the project makespan. We present a new 0-1 linear programming formulation of the problem that requires an exponential number of variables, corresponding to all feasible subsets...
Persistent link: https://www.econbiz.de/10009197597
This paper addresses the issue of how to generate problem instances of controlled difficulty. It focuses on precedence- and resource-constrained (project) scheduling problems, but similar ideas may be applied to other network optimization problems. It describes a network construction procedure...
Persistent link: https://www.econbiz.de/10009204340
Entrepreneurs that were employed by successful industry incumbents prior to founding tend to confer advantages on their new organizations. We propose and then demonstrate a similar "network progeny" effect rooted in the social relationships that form among entrepreneurs. Our analysis of new...
Persistent link: https://www.econbiz.de/10010990546
This paper considers a stochastic shortest path problem where the arc lengths are independent random variables following a normal distribution. In this problem, the optimal path is one that maximizes the expected utility, with the utility function being piecewise-linear and concave. Such a...
Persistent link: https://www.econbiz.de/10009189599