Showing 1 - 4 of 4
This paper examines two due-date setting problems first studied by Wein (1991). The first problem seeks to minimize the average due-date lead time (due-date minus arrival date) of jobs subject to a constraint on the fraction of tardy jobs (Problem I) while the second uses the same objective...
Persistent link: https://www.econbiz.de/10009191273
We present a method for setting release times for jobs with due dates in a stochastic production flow line for which the sequence of jobs has been determined. Unlike other approaches to this problem, ours considers a transient situation. Thus, the flow line will typically contain work in process...
Persistent link: https://www.econbiz.de/10009208761
We model a CONWIP (CONstant Work-in-Process) production line with deterministic processing times and exponential failure and repair times as a closed queueing network. We derive an approximation for the mean and variance of the output during a specified interval and give computable conditions...
Persistent link: https://www.econbiz.de/10009214301
We present an analytic model relating the mean cycle time or throughput as a function of the number of jobs in a closed production system composed of a tandem network of queues having exponential and/or IFR processing times. This model exhibits macroscopic behavior that is predicted by results...
Persistent link: https://www.econbiz.de/10009214687