Showing 1 - 2 of 2
Previous authors have shown that dynamic ratio scheduling rules do not always behave as intended. A recent proposal by Adam and Surkis (Adam, N. R., J. Surkis. 1980. Priority update intervals and anomalies in dynamic ratio type job shop scheduling rules. Management Sci. 26 (12, December)...
Persistent link: https://www.econbiz.de/10009204550
This paper addresses the problem of n jobs to be scheduled on a single machine in such a way that flow time variation is minimized. When the measure of variation is total absolute difference of completion times (TADC) the problem is shown to be quite simple. Sufficient conditions are shown for...
Persistent link: https://www.econbiz.de/10009218423