This contribution presents an efficient solution method for solving the major short-term planning problems which occur, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling. Since both problems heavily interact, we propose an...
Persistent link: https://www.econbiz.de/10011558736
Persistent link: https://www.econbiz.de/10001376504
Persistent link: https://www.econbiz.de/10001356120
This contribution summarizes recent work in the field of lot sizing and scheduling. The objective is not to give a comprehensive literature survey, but to explain differences of formal models and to provide some first readings recommendations. Our focus is on capacitated, dynamic, and...
Persistent link: https://www.econbiz.de/10011808819
This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.
Persistent link: https://www.econbiz.de/10011808833
Persistent link: https://www.econbiz.de/10001514349
In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011734645
Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances. Thus, heuristics have become a popular research field. Up to now, however, tight...
Persistent link: https://www.econbiz.de/10011734980