Showing 1 - 10 of 136
We define a general class of network formation models, Statistical Exponential Random Graph Models (SERGMs), that nest standard exponential random graph models (ERGMs) as a special case. We provide the first general results on when these models' (including ERGMs) parameters estimated from the...
Persistent link: https://www.econbiz.de/10010796660
The Diebold-Mariano (DM) test was intended for comparing forecasts; it has been, and remains, useful in that regard. The DM test was not intended for comparing models. Unfortunately, however, much of the large subsequent literature uses DM-type tests for comparing models, in (pseudo-)...
Persistent link: https://www.econbiz.de/10010796678
This paper develops a covariate-based approach to the external validity of instrumental variables (IV) estimates. Assuming that differences in observed complier characteristics are what make IV estimates differ from one another and from parameters like the effect of treatment on the treated, we...
Persistent link: https://www.econbiz.de/10008756465
The conventional wisdom is (i) that fiscal austerity was the main culprit for the recessions experienced by many countries, especially in Europe, since 2010 and (ii) that this round of fiscal consolidation was much more costly than past ones. The contribution of this paper is a clarification of...
Persistent link: https://www.econbiz.de/10011119804
We use a large project-level dataset to estimate the length of the planning period for commercial construction projects in the United States. We find that these time-to-plan lags are long, averaging about 17 months when we aggregate the projects without regard to size and more than 28 months...
Persistent link: https://www.econbiz.de/10010890095
Tenant rental shelter is by far the most important component of the CPI, because it is used as a proxy for owner-occupied housing. This paper develops a wide variety of current and historical evidence dating back to 1914 to demonstrate that the CPI rent index is biased downward for all of the...
Persistent link: https://www.econbiz.de/10005088897
In public sector procurement, social welfare often depends on the time taken to complete the contract. A leading example is highway construction, where slow completion times inflict a negative externality on commuters. Recently, highway departments have introduced innovative contracting methods...
Persistent link: https://www.econbiz.de/10005575490
What can we, as users of microdata, formally guarantee to the individuals (or firms) in our dataset, regarding their privacy? We retell a few stories, well-known in data-privacy circles, of failed anonymization attempts in publicly released datasets. We then provide a mostly informal...
Persistent link: https://www.econbiz.de/10010821909
Mean-variance efficient portfolios constructed using sample moments often involve taking extreme long and short positions. Hence practitioners often impose portfolio weight constraints when constructing efficient portfolios. Green and Hollifield (1992) argue that the presence of a single...
Persistent link: https://www.econbiz.de/10005088668
This paper derives indicators of the severity and structure of banking system risk from asymptotic interdependencies between banks%u2019 equity prices. We use new tools available from multivariate extreme value theory to estimate individual banks%u2019 exposure to each other (%u201Ccontagion...
Persistent link: https://www.econbiz.de/10005088672