Showing 1 - 5 of 5
A problem is studied in which several non-cooperating clients compete for earlier execution of their jobs in a processing sequence of a single service provider in order to minimize job completion time costs. The clients can move their jobs earlier in a given sequence. They are assumed not to...
Persistent link: https://www.econbiz.de/10010738085
The problem of equipment selection for a production line is considered. Each piece of equipment, also called unit or block, performs a set of operations. All necessary operations of the line and all available blocks with their costs are known. The difficulty is to choose the most appropriate...
Persistent link: https://www.econbiz.de/10009195143
We study a planning problem of an imperfect production of a single product. The product is assumed to be continuously divisible. There are two facilities: a main facility dedicated to the original production and a facility dedicated to re-manufacturing defective units coming from the main...
Persistent link: https://www.econbiz.de/10008488517
This paper surveys a large variety of mathematical models and up-to-date solution techniques developed for solving a general flight gate scheduling problem that deals with assigning different aircraft activities (arrival, departure and intermediate parking) to distinct aircraft stands or gates....
Persistent link: https://www.econbiz.de/10005206224
The paper presents a new graph representation, the graph matrix, which combines the adjacency matrix with the linked lists allowing for the fastest possible access to different types of information on a graph. This is increasingly important for a high search performance, for instance, for...
Persistent link: https://www.econbiz.de/10005358531