Showing 1 - 10 of 14
This paper addresses the issue of project standby capacity optimization for capital budgeting. A detailed analysis and case study show that this is a particular real-option based situation, which solicits the use of statistical simulation. The method can be recommended as a useful heuristic for...
Persistent link: https://www.econbiz.de/10009398922
Persistent link: https://www.econbiz.de/10009376229
been widely afirmed; knaves were becoming virtuous and property conferred respect and authority upon the "nouveau riche". …
Persistent link: https://www.econbiz.de/10005036660
organizations. Contrary to contributory organizations, joint-stock companies can own property, which significantly influences the …
Persistent link: https://www.econbiz.de/10009398952
Persistent link: https://www.econbiz.de/10000720846
Persistent link: https://www.econbiz.de/10001025392
Persistent link: https://www.econbiz.de/10001131708
Persistent link: https://www.econbiz.de/10001075402
Persistent link: https://www.econbiz.de/10001075890
Persistent link: https://www.econbiz.de/10001281481