This paper addresses the problem of interaction between short run and long run locational signals and the coordination between generation investments and lumpy transmission investments. The short run locational signals we evaluate are sent by nodal pricing and the long run ones are sent by the...
Persistent link: https://www.econbiz.de/10008791073
This paper examines how transmission coordinates with generation to the long term in a liberalized power system. We rely on a modular analysis to separate the mechanisms of coordination between generation and transmission of electricity into distinct modules. The governance structure of...
Persistent link: https://www.econbiz.de/10008792268
It is puzzling today to explain diversity and imperfection of actual transmission monopoly designs in competitive electricity markets. We argue that transmission monopoly in competitive electricity markets has to be analysed within a Wilson (2002) modular framework. Applied to the management of...
Persistent link: https://www.econbiz.de/10008792631
This paper examines how transmission coordinates with generation to the long term in a liberalized power system. We rely on a modular analysis to separate the mechanisms of coordination between generation and transmission of electricity into distinct modules. The governance structure of...
Persistent link: https://www.econbiz.de/10008792791
This paper examines how transmission coordinates with generation to the long term in a liberalized power system. We rely on a modular analysis to separate the mechanisms of coordination between generation and transmission of electricity into distinct modules. The governance structure of...
Persistent link: https://www.econbiz.de/10008793244
This paper aims at understanding and assessing the main methods proposed by ETSO and EuroPEX [1] to define and allocate interconnection capacities in Europe. We model these methods and evaluate their technical and economic efficiency on a 7-node network. We find first, that, unsurprisingly, the...
Persistent link: https://www.econbiz.de/10008789405
This paper aims at assessing the impact of massive wind power penetration on the calculation of Available Transfer Capacity (ATC) for the interconnections between European countries. Calculations are made for the ATC between France and Belgium and are realized on a realistic European Electricity...
Persistent link: https://www.econbiz.de/10008792373
Persistent link: https://www.econbiz.de/10003827121
This paper proposes a probabilistic model to evaluate if a proactive TSO that anticipates the connection of new generators with short construction duration compared to the time needed to reinforce the network is more efficient than a reactive TSO that does not make any anticipation but that may...
Persistent link: https://www.econbiz.de/10008596167
Power generation and transmission are complementary activities that must be coordinated to ensure an optimal use and development of the transmission network. This coordination is today more difficult in a liberalized system, because of unbundling and the freedom for investors to choose their...
Persistent link: https://www.econbiz.de/10014619192