Showing 1 - 10 of 569
Persistent link: https://www.econbiz.de/10003440679
We describe how a generic multi-period optimization-based decision support system (DSS) can be used for strategic planning in process industries. The DSS is built on five fundamental elements . materials, facilities, activities, storage areas and time periods. It requires little direct knowledge...
Persistent link: https://www.econbiz.de/10008800561
Competitive pressures on power plants have seen them attempting to reduce their operating expenses for profitable operations. In India, the plants use wagons of the Indian Railways to transport coal from the mines (in case of domestic coal) or from the ports (in case of imported coal). Once...
Persistent link: https://www.econbiz.de/10008801517
Asset - Liability management is one of the most critical tasks for any financial institution for determining its cushion against the risk and the net returns. The problem of asset liability management for an insurance company requires matching the cash inflows from premium collections and...
Persistent link: https://www.econbiz.de/10008801757
Insurance as a financial instrument has been used for a long time. The dramatic increase in competition within the insurance sector (in terms of providers coupled with awareness for the need for insurance) has concomitantly resulted in more policy options being available in the market. The...
Persistent link: https://www.econbiz.de/10008801784
In this paper we discuss a deterministic model for computing the capacity of the escalator in London Underground. We develop this model from fundamental principles of engineering by separating the capacities of standing and walking side of the escalator. By collecting real world data, we find...
Persistent link: https://www.econbiz.de/10008802130
The Cumulative Sum (CUSUM) procedure is an effective statistical process control tool that can be used to monitor quality of ready mixed concrete (RMC) during its production process. Online quality monitoring refers to monitoring of the concrete quality at the RMC plant during its production...
Persistent link: https://www.econbiz.de/10008802293
In this paper, we discuss a method of measurement of project risk, based on the expected value method (EVM). Project risk management primarily comprises cost and schedule uncertainties and risks associated with each activity of the project network. We have identified the major risk sources and...
Persistent link: https://www.econbiz.de/10008839251
Persistent link: https://www.econbiz.de/10009752719
Persistent link: https://www.econbiz.de/10009752757