Showing 1 - 10 of 547
We describe how a generic multi-period optimization-based decision support system (DSS) can be used for strategic planning in process industries. The DSS is built on five fundamental elements . materials, facilities, activities, storage areas and time periods. It requires little direct knowledge...
Persistent link: https://www.econbiz.de/10008800561
Competitive pressures on power plants have seen them attempting to reduce their operating expenses for profitable operations. In India, the plants use wagons of the Indian Railways to transport coal from the mines (in case of domestic coal) or from the ports (in case of imported coal). Once...
Persistent link: https://www.econbiz.de/10008801517
Artificial Neural Network (ANN) has been shown to be an efficient tool for non-parametric modeling of data in a variety of different contexts where the output is a non-linear function of the inputs. These include business forecasting, credit scoring, bond rating, business failure prediction,...
Persistent link: https://www.econbiz.de/10008801597
Insurance as a financial instrument has been used for a long time. The dramatic increase in competition within the insurance sector (in terms of providers coupled with awareness for the need for insurance) has concomitantly resulted in more policy options being available in the market. The...
Persistent link: https://www.econbiz.de/10008801784
In this paper we discuss a deterministic model for computing the capacity of the escalator in London Underground. We develop this model from fundamental principles of engineering by separating the capacities of standing and walking side of the escalator. By collecting real world data, we find...
Persistent link: https://www.econbiz.de/10008802130
The Cumulative Sum (CUSUM) procedure is an effective statistical process control tool that can be used to monitor quality of ready mixed concrete (RMC) during its production process. Online quality monitoring refers to monitoring of the concrete quality at the RMC plant during its production...
Persistent link: https://www.econbiz.de/10008802293
In this paper, we discuss a method of measurement of project risk, based on the expected value method (EVM). Project risk management primarily comprises cost and schedule uncertainties and risks associated with each activity of the project network. We have identified the major risk sources and...
Persistent link: https://www.econbiz.de/10008839251
This note raise many policy issues related to real estate and the urban sector. Urban issues and the very high cost of real estate in India have deep rooted problems that have their origin in the policy, law and working of government. The potential of high growth to deliver benefits to people...
Persistent link: https://www.econbiz.de/10008727406
This working paper confines its scope to performance of National Agricultural Insurance Scheme (NAIS). It examines the progress of NAIS in India and in one selected state, Gujarat. The two dimensions considered are coverage over time and across the states. It is further disaggregated for...
Persistent link: https://www.econbiz.de/10008526681
This working paper confines its scope to performance of National Agricultural Insurance Scheme (NAIS). It examines the progress of NAIS in India and in one selected state, Gujarat. The two dimensions considered are coverage over time and across the states. It is further disaggregated for...
Persistent link: https://www.econbiz.de/10008526682