Showing 1 - 10 of 11
Persistent link: https://www.econbiz.de/10013434052
Persistent link: https://www.econbiz.de/10015407939
Persistent link: https://www.econbiz.de/10015189539
Persistent link: https://www.econbiz.de/10012271052
Persistent link: https://www.econbiz.de/10012233518
Persistent link: https://www.econbiz.de/10014287784
Supplier selection and allocation of optimal order quantity are two of the most important processes in closed-loop supply chain (CLSC) and reverse logistic (RL). So that providing high quality raw material is considered as a basic requirement for a manufacturer to produce popular products, as...
Persistent link: https://www.econbiz.de/10011773042
Purpose: Analyzing factors of delays in construction projects and determining their impact on project performance is necessary to better manage and control projects. Identification of root factors which may lead to project delay and increased cost is vital at the early or planning stage. Better...
Persistent link: https://www.econbiz.de/10012185526
Supplier selection and allocation of optimal order quantity are two of the most important processes in closed-loop supply chain (CLSC) and reverse logistic (RL). So that providing high quality raw material is considered as a basic requirement for a manufacturer to produce popular products, as...
Persistent link: https://www.econbiz.de/10011565263
Persistent link: https://www.econbiz.de/10011845847