Showing 1 - 10 of 18
Persistent link: https://www.econbiz.de/10015359558
We consider a family of N items which are produced in or obtained from the same production facility. Demands are deterministic for each item and each period within a given horizon of T periods. If in a given period an order is placed, setup costs are incurred. The aggregate order size is...
Persistent link: https://www.econbiz.de/10005090711
Persistent link: https://www.econbiz.de/10001113431
Power grid expansion planning is a challenging problem that typically considers the facility location, sizing, and transmission line upgrade aspects, with the objective of minimizing the upgrade and operational costs. The consideration of fairness and equity between the populations being served...
Persistent link: https://www.econbiz.de/10014241302
Persistent link: https://www.econbiz.de/10009315476
Persistent link: https://www.econbiz.de/10009301823
Persistent link: https://www.econbiz.de/10010474536
Persistent link: https://www.econbiz.de/10003293578
Persistent link: https://www.econbiz.de/10011449053
Persistent link: https://www.econbiz.de/10011999262