Showing 1 - 10 of 25
Persistent link: https://www.econbiz.de/10006513105
Persistent link: https://www.econbiz.de/10006262075
Persistent link: https://www.econbiz.de/10006186224
Persistent link: https://www.econbiz.de/10005109113
The problem of interest is a one product, uncapacitated master production schedule (MPS) in which decisions are made under rolling planning horizons. Demand is stochastic and time varying, and effectiveness is measured by inventory holding, production setup, and backorder costs. Typically, in...
Persistent link: https://www.econbiz.de/10009146269
Persistent link: https://www.econbiz.de/10007187599
Persistent link: https://www.econbiz.de/10006982571
Persistent link: https://www.econbiz.de/10009030392
We present an algorithm for determining the optimal solution over the entire planning horizon for the dynamic lot-size model where demand is stochastic and non-stationary. The optimal solution to the deterministic problem is the well-known Wagner-Whitin algorithm. The present work contributes...
Persistent link: https://www.econbiz.de/10004973502
Persistent link: https://www.econbiz.de/10006822763