Showing 1 - 10 of 164
We consider the problem of scheduling multiple projects subject to joint resource constraints. Most approaches proposed in the literature so far are based on the unrealistic assumption that resources can be transferred from one project to the other without any expense in time or cost. In order...
Persistent link: https://www.econbiz.de/10005240729
Persistent link: https://www.econbiz.de/10008884949
Persistent link: https://www.econbiz.de/10008384057
Persistent link: https://www.econbiz.de/10004554947
Persistent link: https://www.econbiz.de/10004882511
Persistent link: https://www.econbiz.de/10004882526
Persistent link: https://www.econbiz.de/10004222287
Assembly line balancing problems (ALBP) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along the line subject to a strict or average...
Persistent link: https://www.econbiz.de/10004973584
Nowadays, mixed-model assembly lines are applied in a wide range of industries to mass-produce customized products to order, e.g., in automobile industry. An important decision problem in this context receiving a lot of attention from researchers and practitioners is the sequencing problem,...
Persistent link: https://www.econbiz.de/10010871103
This paper deals with the generalized resource-constrained project scheduling problem (GRCPSP) which extends the well-known resource-constrained project scheduling problem (RCPSP) by considering job specific release and due dates, non-negative minimum start-to-start time lags as well as...
Persistent link: https://www.econbiz.de/10010847827