Showing 1 - 10 of 116
Persistent link: https://www.econbiz.de/10006158212
An alternative heuristic method for scheduling repetitive projects in which resources are limited and activities may be executed with multiple modes of resource demands associated with different durations is proposed. Unlike general heuristic methods that separately analyze each competing...
Persistent link: https://www.econbiz.de/10005482401
Persistent link: https://www.econbiz.de/10006158640
Persistent link: https://www.econbiz.de/10005287695
Reduction in construction project duration is generally linked to additional cost due to more expensive resources required. Hence tradeoff between time and cost is crucial to the efficiency of a construction project. The time-cost tradeoff (TCT) issue has been studied through various...
Persistent link: https://www.econbiz.de/10008603277
The hook times of mobile cranes are processes that are of non-linear and discrete nature. Artificial neural network is a data processing technique that lends itself to this kind of problem. Three common artificial neural network architectures - multi-layer feed-forward (MLFF), group method of...
Persistent link: https://www.econbiz.de/10005445627
Persistent link: https://www.econbiz.de/10006384878
Persistent link: https://www.econbiz.de/10006227155
Persistent link: https://www.econbiz.de/10006159492
Persistent link: https://www.econbiz.de/10006164220