Showing 1 - 10 of 34
Persistent link: https://www.econbiz.de/10005283674
We study an optimal design problem for serial machining lines. Such lines consist of a sequence of stations. At every station, the operations to manufacture a product are grouped into blocks. The operations within each block are performed simultaneously by the same spindle head and the blocks of...
Persistent link: https://www.econbiz.de/10005287628
Persistent link: https://www.econbiz.de/10007984450
Persistent link: https://www.econbiz.de/10007289640
Persistent link: https://www.econbiz.de/10007022465
Persistent link: https://www.econbiz.de/10002209820
Persistent link: https://www.econbiz.de/10002671180
The total sum of capital investments in ferrous metallurgy during the Fifth Five Year Plan considerably exceeded the investments in the preceding five-year plan. If the average annual capital investments in ferrous metallurgy during the First Five Year Plan is 100, then investments during the...
Persistent link: https://www.econbiz.de/10008754463
Persistent link: https://www.econbiz.de/10001859557
We consider a single resource that performs a set of jobs, each job being defined by its operation time and its due date. Jobs are not preemptive, which means that a job that starts cannot be interrupted before completion. These jobs have been scheduled so as to minimize the total tardiness, and...
Persistent link: https://www.econbiz.de/10004973549