Showing 1 - 10 of 70
Some of the previous research indicates that no single priority rule could perform excellently on those common performance measures. This study focuses on evaluating the impact of deploying combinations of four single priority rules on a three-stage manufacturing flow shop, i.e., different rules...
Persistent link: https://www.econbiz.de/10010816987
Persistent link: https://www.econbiz.de/10008077293
Persistent link: https://www.econbiz.de/10008817138
Parameter estimation based on uncertain data represented as belief structures is one of the latest problems in the Dempster–Shafer theory. In this paper, a novel method is proposed for the parameter estimation in the case where belief structures are uncertain and represented as interval-valued...
Persistent link: https://www.econbiz.de/10011077627
Persistent link: https://www.econbiz.de/10006870535
Persistent link: https://www.econbiz.de/10006748974
Persistent link: https://www.econbiz.de/10006554420
Persistent link: https://www.econbiz.de/10006158817
Persistent link: https://www.econbiz.de/10006126466
Persistent link: https://www.econbiz.de/10006128394