Showing 1 - 10 of 28
Persistent link: https://www.econbiz.de/10006421350
Persistent link: https://www.econbiz.de/10006104852
Persistent link: https://www.econbiz.de/10006524930
Persistent link: https://www.econbiz.de/10006418668
Persistent link: https://www.econbiz.de/10006419087
Persistent link: https://www.econbiz.de/10006419860
Persistent link: https://www.econbiz.de/10006419866
Persistent link: https://www.econbiz.de/10006420272
This paper considers a one-machine scheduling problem where the objective is to minimize the sum of weighted completion times subject to release dates. A polynomial time algorithm is developed for the case when the jobs are clustered. The jobs in each cluster must be processed sequentially and...
Persistent link: https://www.econbiz.de/10009197720
In this paper we consider a certain aggregate production planning model. This model permits regular and overtime production and allows for backordering of goods for a number of periods. Although the discussed model can be formulated as a linear programming problem a special (noniterative) method...
Persistent link: https://www.econbiz.de/10009203840