Showing 1 - 10 of 29
Most classical scheduling research assumes that the objectives sought are common to all jobs to be scheduled. However, many real-life applications can be modeled by considering different sets of jobs, each one with its own objective(s), and an increasing number of papers addressing these...
Persistent link: https://www.econbiz.de/10010744222
This research focuses on how two common modeling assumptions in the Bullwhip Effect (BWE) literature (i.e., assuming the return of the excess of goods and assuming a serial network) may distort the results obtained. We perform a robust design of experiments where the return condition (return vs....
Persistent link: https://www.econbiz.de/10011190243
The goal of this paper is to quantify the impact of Inventory Record Inaccuracy on the dynamics of collaborative supply chains, both in terms of operational performance (i.e. order and inventory stability), and customer service level. To do so, we model an Information Exchange Supply Chain under...
Persistent link: https://www.econbiz.de/10011190811
In this work a new benchmark of hard instances for the permutation flowshop scheduling problem with the objective of minimising the makespan is proposed. The new benchmark consists of 240 large instances and 240 small instances with up to 800 jobs and 60 machines. One of the objectives of the...
Persistent link: https://www.econbiz.de/10010939781
Persistent link: https://www.econbiz.de/10006654561
Persistent link: https://www.econbiz.de/10006822531
Persistent link: https://www.econbiz.de/10006229781
Persistent link: https://www.econbiz.de/10006229787
Persistent link: https://www.econbiz.de/10006131070
Persistent link: https://www.econbiz.de/10006132519