Contingency situations may cause emergency states in distribution systems; these states are defined as the interruption of power supply. Such situations should be avoided whenever possible in order to maintain certain quality limits related to frequency and duration of interruptions. The main...
Persistent link: https://www.econbiz.de/10005253842
Persistent link: https://www.econbiz.de/10007984466
Persistent link: https://www.econbiz.de/10002196003
Persistent link: https://www.econbiz.de/10006659458
Persistent link: https://www.econbiz.de/10006484821
Persistent link: https://www.econbiz.de/10005008782
We propose the use of metaheuristics for the resource-capacitated multilevel lot-sizing problem with general product structures, setup costs, setup times, and lead times. Initially, we develop a heuristic which moves production in time in order to obtain feasible solutions with good quality....
Persistent link: https://www.econbiz.de/10005080666
We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or in terms of a desired flow of commodities between source and destination...
Persistent link: https://www.econbiz.de/10008488521
The lot-sizing problem considered in this paper consists in planning the production of multiple items on a single machine over a finite planning horizon divided into time periods. The objective of the problem is to determine a minimum cost production plan that meets the forecast demand for the...
Persistent link: https://www.econbiz.de/10005358457
Persistent link: https://www.econbiz.de/10008223240