Showing 1 - 10 of 31
Persistent link: https://www.econbiz.de/10009834144
Persistent link: https://www.econbiz.de/10005414342
This paper formulates an optimal design model for assembly/disassembly manufacturing networks. The objective is to maximize production rate subject to a total cost constraint. Machines are chosen from a list of products available on the market, and sizes of the buffers are chosen within a...
Persistent link: https://www.econbiz.de/10010785062
This paper considers the problem of coordinated spare-part logistics and operations planning for third-party maintenance providers. Due to the multi-indenture structure of the equipment, different types of components might randomly fail to perform at different points of time. The spare part...
Persistent link: https://www.econbiz.de/10011076747
Persistent link: https://www.econbiz.de/10006821534
Persistent link: https://www.econbiz.de/10006809995
Persistent link: https://www.econbiz.de/10006815680
We present a generalization of the classical supervisory control theory for discrete event systems to a setting of dense real-time systems modeled by Alur and Dill timed automata. The main problem involved is that in general the state space of a timed automaton is (uncountably) infinite. The...
Persistent link: https://www.econbiz.de/10010748468
This paper addresses a multi-period, multi-product sawmill production planning problem where the yields of processes are random variables due to non-homogeneous quality of raw materials (logs). In order to determine the production plans with robust customer service level, robust optimization...
Persistent link: https://www.econbiz.de/10008483162
In this paper, we consider a multi-period, multi-product production planning problem where the production rate and the customer service level are random variables due to machine breakdowns. In order to determine robust production plans, constraints are introduced in the stochastic capacitated...
Persistent link: https://www.econbiz.de/10008865299