Showing 1 - 7 of 7
Persistent link: https://www.econbiz.de/10006170901
Persistent link: https://www.econbiz.de/10006011811
Persistent link: https://www.econbiz.de/10006123044
We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. Based on these viewpoints we propose a positioning framework to distinguish between different types of project-driven organisations. This framework is meant to aid project...
Persistent link: https://www.econbiz.de/10005336230
The goal of this article is to survey the relevant literature on project scheduling with possible activity failures from a number of different disciplines, and to distill from these sources the formulation of a general optimization problem, the further study of which we would like to foster...
Persistent link: https://www.econbiz.de/10008684372
Persistent link: https://www.econbiz.de/10007392132
An inherent characteristic of Ramp;D projects is technological uncertainty, which may result in project failure, and time and resources spent without any tangible return. In pharmaceutical projects, for instance, stringent scientific procedures have to be followed to ensure patient safety and...
Persistent link: https://www.econbiz.de/10012731999