Showing 1 - 10 of 107
The marginal cost of plant capacity, measured by the price of equity is significantly procyclical. Yet, the price of a major intermediate input into expanding plant capacity, investment goods, is coutercyclical. The ratio of these prices is Tobin's q. We interpret the fact that Tobin's q differs...
Persistent link: https://www.econbiz.de/10012774987
Persistent link: https://www.econbiz.de/10012750480
Household investment leads nonresidential business fixed investment over the U.S. business cycle. Because real business cycle theory has not been able to account for this observation, it represents a potent challenge to the view that transitory productivity disturbances are the main source of...
Persistent link: https://www.econbiz.de/10012777738
We propose two methods to choose the variables to be used in the estimation of the structural parameters of a singular DSGE model. The first selects the vector of observables that optimizes parameter identification; the second the vector that minimizes the informational discrepancy between the...
Persistent link: https://www.econbiz.de/10011083464
We investigate the time variation in the correlation between hours and technology shocks using a structural business cycle model. We propose an RBC model with a Constant Elasticity of Substitution (CES) production function that allows for capital- and labor-augmenting technology shocks. We...
Persistent link: https://www.econbiz.de/10010903472
We study the relationship between hours worked and technology during the postwar period in the US. We show that the responses of hours to technological improvements have increased over time, and that the patterns captured by the SVAR are consistent with those obtained from an RBC model with a...
Persistent link: https://www.econbiz.de/10010862289
Persistent link: https://www.econbiz.de/10011144494
Persistent link: https://www.econbiz.de/10008727249
DSGE models are currently estimated with a two step approach: data is first filtered and then DSGE structural parameters are estimated. Two step procedures have problems, ranging from trend misspecification to wrong assumption about the correlation between trend and cycles. In this paper, I...
Persistent link: https://www.econbiz.de/10005835776
Persistent link: https://www.econbiz.de/10009216157