Showing 1 - 10 of 19
Persistent link: https://www.econbiz.de/10004299676
Persistent link: https://www.econbiz.de/10002219152
Persistent link: https://www.econbiz.de/10014586556
Persistent link: https://www.econbiz.de/10007993415
Persistent link: https://www.econbiz.de/10007993416
Persistent link: https://www.econbiz.de/10010067293
The flow of parts through a production network is usually pre-planned by a central control system. Such central control fails in presence of highly fluctuating demand and/or unforeseen disturbances. To manage such dynamic networks according to low work-in-progress and short throughput times, an...
Persistent link: https://www.econbiz.de/10010874080
Persistent link: https://www.econbiz.de/10007993705
Persistent link: https://www.econbiz.de/10007267545
Persistent link: https://www.econbiz.de/10007027622