Delay management models determine which connections should be maintained in case of a delayed feeder train. Recently, delay management models are developed that take into account that passengers will adjust their routes when they miss a connection. However, for large-scale real-world instances,...
Persistent link: https://www.econbiz.de/10009369371
The question of delay management is whether trains should wait for a delayed feeder train or should depart on time. In classical delay management models passengers always take their originally planned route. In this paper, we propose a model where re-routing of passengers is incorporated. To...
Persistent link: https://www.econbiz.de/10008484091
Persistent link: https://www.econbiz.de/10006424116
Persistent link: https://www.econbiz.de/10005161466
The Dutch railway network experiences about three large disruptions per day on average. In this paper, we present an algorithm to reschedule the crews when such a disruption occurs. The algorithm is based on column generation techniques combined with Lagrangian heuristics. Since the number of...
Persistent link: https://www.econbiz.de/10005450840
Given a set of timetabled tasks, the multi-depot vehicle scheduling problem is a well-known problem that consists of determining least-cost schedules for vehicles assigned to several depots such that each task is accomplished exactly once by a vehicle. In this paper, we propose to compare the...
Persistent link: https://www.econbiz.de/10005450847
This paper describes a model that generates weekly movie schedules in a multiplex movie theater. A movie schedule specifies within each day of the week, on which screen(s) different movies will be played, and at which time(s). The model consists of two parts: (i) conditional forecasts of the...
Persistent link: https://www.econbiz.de/10005450882
This paper describes a method for solving the cyclic crew rostering problem (CCRP). This is the problem of cyclically ordering a set of duties for a number of crew members, such that several complex constraints are satisfied and such that the quality of the obtained roster is as high as...
Persistent link: https://www.econbiz.de/10005450906
When tracks are out of service for maintenance during a certain period, trains cannot be operated on those tracks. This leads to a modified timetable, and results in infeasible rolling stock and crew schedules. Therefore, these schedules need to be repaired. The topic of this paper is the...
Persistent link: https://www.econbiz.de/10004972202
Persistent link: https://www.econbiz.de/10006600445