We consider a master surgery scheduling (MSS) problem in which block operating room (OR) time is assigned to different surgical specialties. While many MSS approaches in the literature consider only the impact of the MSS on operating theater and operating staff, we enlarge the scope to...
Persistent link: https://www.econbiz.de/10011097797
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially renewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make,...
Persistent link: https://www.econbiz.de/10009191542
This paper addresses the towing process of airplanes as part of the turnaround process. We introduce a VRP based MIP model which assigns different types of towing tractors to jobs with specified service time windows. The objective function minimizes operating costs subject to operational...
Persistent link: https://www.econbiz.de/10010931059
Persistent link: https://www.econbiz.de/10011558740
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially reiiewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make...
Persistent link: https://www.econbiz.de/10011799792
Persistent link: https://www.econbiz.de/10000682119
Persistent link: https://www.econbiz.de/10011545047
Persistent link: https://www.econbiz.de/10011410756
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially reiiewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make...
Persistent link: https://www.econbiz.de/10011808900
Persistent link: https://www.econbiz.de/10010433349