Showing 1 - 8 of 8
This paper considers a scheduling problem with two identical parallel machines. One has unlimited capacity; the other can only run for a fixed time. A given set of jobs must be scheduled on the two machines with the goal of minimizing the sum of their completion times. The paper proposes an...
Persistent link: https://www.econbiz.de/10005240522
Persistent link: https://www.econbiz.de/10008884951
In the scheduling literature, it is often assumed that jobs arrive either simultaneously or individually. However, this assumption is invalid in most practical situations because jobs usually arrive in batches, e.g., the final testing house in the manufacturing of semiconductor. The concept of...
Persistent link: https://www.econbiz.de/10008521497
Persistent link: https://www.econbiz.de/10009980973
Persistent link: https://www.econbiz.de/10010054467
Persistent link: https://www.econbiz.de/10009684606
Persistent link: https://www.econbiz.de/10008418509
Persistent link: https://www.econbiz.de/10008891287