The problem of scheduling multiple, large scale, make-to-order assemblies is considered. Beside "classical" precedence- and resource constraints as known from resource constrained project scheduling we take spatial resource and part availability constraints into account. The objective is to...
Persistent link: https://www.econbiz.de/10011558728
We consider the problem of scheduling multiple, large-scale, make-to-order assemblies under resource, assembly area, and part availability constraints. Such problems typically occur in the assembly of high volume, discrete make-to-order products. Based on a list scheduling procedure which has...
Persistent link: https://www.econbiz.de/10011558732
The car sequencing problem is to find feasible sequences of product variants requiring specific options while taking care of sequencing constraints. First, a branching scheme and constraint propagation algorithms for the computation of feasible sequences are provided. Second, an algorithm is...
Persistent link: https://www.econbiz.de/10011558763
Nicht in erster Linie der Stoff macht das Wesen eines Faches aus, sondern das in ihm gepflegte Denken. ... Die Pflege des betriebswirtschaftlichen Denkens ist nach meiner Meinung neben der Forschungsarbeit die wesentliche Aufgabe der akademischen Betriebswirtschaftslehre. Nach unserer Meinung...
Persistent link: https://www.econbiz.de/10011613725
Im Bereich der Entwicklung elektronischer Leitstände werden derzeit große Anstrengungen unternommen, die Produktionsplanung und -steuerung wissensbasiert zu unterstützen. Von besonderem Interesse sind dabei Konzepte und Implementierungen wissensbasierter Leitstände zur Losgrößen-, Termin-...
Persistent link: https://www.econbiz.de/10011613726
A batch sequencing model with sequence-dependent setup-times and -costs is used to compare modelling and solving with two different general solvers. "Conceptual models" are implemented in the constraint propagation / logic programming language CHARME and solved with the PROLOG inference engine....
Persistent link: https://www.econbiz.de/10011613727
Lotsizing and scheduling comprises activities which have to be done repeatedly within MRP-systems. We consider the proportional (multi-item, capacitated, dynamic) lotsizing and scheduling problem which is more general than the discrete lotsizing and scheduling problem as well as the continuous...
Persistent link: https://www.econbiz.de/10011613728
The discrete lotsizing and scheduling problem with setup-times is transformed into a single-machine scheduling problem, denoted as batch sequencing problem, which integrates sequence-dependent setups as well. The relationship between the lotsizing and the batch sequencing problem is analyzed....
Persistent link: https://www.econbiz.de/10011613742
In machine tool assembly several make-to-order products have to be manufactured simultaneously in a multi-stage production system. Due to customer requirements batches are very small. A process plan specifies the neccessary machines, tools, auxiliary devices as well as the operations to be...
Persistent link: https://www.econbiz.de/10011613744
We review the well-known RSM priority rule to solve the resource constrained project scheduling problem. A detailed analysis of this rule reveals that it is based on assumptions which do not hold in general and hence might lead to poor solutions. Consequently, an improved RSM priority rule is...
Persistent link: https://www.econbiz.de/10011613747