Showing 1 - 8 of 8
Inventory constraints refer to so-called cumulative resources, which can store a single or several different products and have a prescribed minimum and maximum inventory, where the inventory is depleted and replenished over time. Some additional applications of cumulative resources, e.g. to...
Persistent link: https://www.econbiz.de/10010847935
Inventory constraints refer to so-called cumulative resources, which can store a single or several different products and have a prescribed minimum and maximum inventory, where the inventory is depleted and replenished over time. Some additional applications of cumulative resources, e.g. to...
Persistent link: https://www.econbiz.de/10010999935
We study the scheduling of projects subject to general temporal constraints between activities such that the project net present value is maximized. The proposed algorithm is based on a first-order steepest ascent approach, where the steepest ascent directions are normalized by the supremum...
Persistent link: https://www.econbiz.de/10010847874
We study the scheduling of projects subject to general temporal constraints between activities such that the project net present value is maximized. The proposed algorithm is based on a first-order steepest ascent approach, where the steepest ascent directions are normalized by the supremum...
Persistent link: https://www.econbiz.de/10010999876
We consider the problem of scheduling multiple projects subject to joint resource constraints. Most approaches proposed in the literature so far are based on the unrealistic assumption that resources can be transferred from one project to the other without any expense in time or cost. In order...
Persistent link: https://www.econbiz.de/10005785942
Most approaches to multi-project scheduling are based on the assumption that resources can be transferred between projects without any expense in time and cost. As this assumption often is not realistic, we generalise the multi-project scheduling problem (RCMPSP) by additionally including...
Persistent link: https://www.econbiz.de/10005785944
A production system which consists of a number of parallel assembly lines is considered. On each line a certain product is manufactured observing a common cycle time. By arranging the lines in a favourable manner, it is possible to increase efficiency of the production system by combining...
Persistent link: https://www.econbiz.de/10005785941
Assembly line balancing problems (ALBPs) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing products among the work stations along the line. On the one hand, research has focussed on developing effective...
Persistent link: https://www.econbiz.de/10005785965