Showing 41 - 50 of 85
Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A...
Persistent link: https://www.econbiz.de/10009435899
An initial security evaluation of the proposed International Monitoring System (IMS) suggests safeguards at various … paper include the use of public-key authentication for data from monitoring stations and for commands issued to monitoring … stations. Other monitoring station safeguards include tamper protection of sensor subsystems, preservation of data (i.e. short …
Persistent link: https://www.econbiz.de/10009435919
Market monitoring involves the systematic analysis of pricesand behavior in wholesale power markets to determine when … market monitoring function. Becausethe West does not have active RTOs outside of California, it does nothave the market … monitoring that RTOs have. In addition, because the Westoutside of California does not have RTOs that perform centralized …
Persistent link: https://www.econbiz.de/10009436025
determine the S&T needs that will facilitate monitoring, characterization, prediction, and assessment activities necessary to …
Persistent link: https://www.econbiz.de/10009436079
The environmental monitoring program has been designed to ensure that BNL facilities operate such that the applicable … regulations are not directly applicable to the monitoring well data since (1) the standards apply to a community water supply … the monitoring wells are not components of the Laboratory's water supply system, the EPA drinking water standards are …
Persistent link: https://www.econbiz.de/10009436167
) Cost Transfer controls need to be increased; and (3) Timely monitoring and close out of contracts needs occur. …
Persistent link: https://www.econbiz.de/10009436230
Sometimes a regulatory requirement or a quality-assurance procedure sets an allowed maximum on a confidence limit for a mean. If the sample mean of the measurements is below the allowed maximum, but the confidence limit is above it, a very widespread practice is to increase the sample size and...
Persistent link: https://www.econbiz.de/10009436257
A defensible characterization strategy must recognize that uncertainties are inherent in any measurement or estimate of interest and must employ statistical methods for quantifying and managing those uncertainties. Estimates of risk and therefore key decisions must incorporate knowledge about...
Persistent link: https://www.econbiz.de/10009436280
Klickitat Basin Coordinator and operational costs for the basin. The Klickitat Subbasin has separate contracts for Monitoring …
Persistent link: https://www.econbiz.de/10009436307
Since the 1994 outmigration, program RealTime has been applied to provide in-season predictions of smolt outmigration timing for individual and aggregates of listed threatened and endangered Snake River salmon stocks. Results from the 1997 smolt outmigrations of wild Snake River yearling and...
Persistent link: https://www.econbiz.de/10009436327