Showing 21 - 30 of 655
The Low-Level Radioactive Waste Forum is an association of representatives of states and compacts established to facilitate state and compact commission implementation of the Low-Level Radioactive Waste Policy Act of 1980 and the Low-Level Radioactive Waste Policy Amendments Act of 1985 and to...
Persistent link: https://www.econbiz.de/10009435936
This brief analysis, which is based on unclassified sources, seeks to identify what some of the implications would be if the Soviets started to move actively to try to provide reprocessing and MOX fabrication services to the US and other countries. While information on Soviet intentions is...
Persistent link: https://www.econbiz.de/10009436045
-term, fixed-cost, attractive financing; loans that are tied to the tax capacity of the property rather than to the owner's credit … photovoltaic (PV) systems. Though financing does not reduce the high up-front cost of PV, by spreading that cost over some portion … of the system's life, financing can certainly make PV systems more affordable. As a result, a number of states have, in …
Persistent link: https://www.econbiz.de/10009435812
photovoltaic (PV) systems. Though financing does not reduce the high up-front cost of PV, by spreading that cost over some portion … of the system's life, financing can certainly make PV systems more affordable. As a result, a number of states have, in … adopters to be wealthy and not in need of financing. Some of these barriers have begun to fade. Most notably, homeowner …
Persistent link: https://www.econbiz.de/10009435964
cooperative utilities in geothermal resource development was assessed in detail. Busbar capital costs were calculated for …
Persistent link: https://www.econbiz.de/10009437319
&E doing to obtain capacity for its existing and future customers? At the present time, most of SDG&E's capital expenditure for … capacity from a reliable, proven generating technology to SDG&E's system. …
Persistent link: https://www.econbiz.de/10009435414
units. The cost estimates presented in this report include characterization costs, capital costs, and annual operation and …
Persistent link: https://www.econbiz.de/10009436609
This paper compares the financing costs of wind turbine powerplants with those of fossil powerplants. The goal of this … Act of 1992 on the financing of wind turbine projects. Conclusions are offered in Section 5. In the past two years there …. Nonetheless, there appears to be a significant advantage in financing costs for conventional projects compared to wind turbines …
Persistent link: https://www.econbiz.de/10009435892
expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a …
Persistent link: https://www.econbiz.de/10009435902
A new regulation framework has been established for the Brazilian electric energy market by a law put into effect on March 15,2004. The main overall goals of this new regulation are: to allow the lowest possible tariffs for end users, while providing the necessary economic incentives for the...
Persistent link: https://www.econbiz.de/10009435556