In this paper, we model a research-and-development project as consisting of several modules, with each module containing one or more activities. We examine how to schedule the activities of such a project in order to maximize the expected profit when the activities have a probability of failure...
Persistent link: https://www.econbiz.de/10014174815
Persistent link: https://www.econbiz.de/10009377472
Persistent link: https://www.econbiz.de/10011290645
A k-out-of-n system configuration requires that, for the overall system to be functional, at least k out of the total of n components be working. We consider the problem of sequentially testing the components of a k-out-of-n system in order to learn the state of the system, when the tests are...
Persistent link: https://www.econbiz.de/10013025496
Persistent link: https://www.econbiz.de/10010202645
This article describes a heuristic for scheduling so-called ‘modular' projects. Exact solutions to this NP-hard problem can be obtained with existing branch-and-bound and dynamic-programming algorithms, but only for small to medium-size instances. The proposed heuristic, by contrast, can be...
Persistent link: https://www.econbiz.de/10013083810
Persistent link: https://www.econbiz.de/10009793036
Persistent link: https://www.econbiz.de/10009716502
Persistent link: https://www.econbiz.de/10009673644
We study the problem of sequentially testing the components of a multi-component system to learn the state of the system, when the tests are subject to precedence constraints and with the objective of minimizing the expected cost of the inspections. Our focus is on k-out-of-n systems, which...