Showing 1 - 10 of 23
Persistent link: https://www.econbiz.de/10009779501
Persistent link: https://www.econbiz.de/10003815325
If the number of assessors in a difference test is not large enough to ensure the desired power of the testing procedure, then it is often advised to use assessors repeatedly. That is, each assessor performs the testing not just once but several times. There is a discussion going on, how results...
Persistent link: https://www.econbiz.de/10009781513
Persistent link: https://www.econbiz.de/10001522631
Persistent link: https://www.econbiz.de/10000015143
Persistent link: https://www.econbiz.de/10001788637
The response from a factorial experiment carried out in a time sequence may be affected by uncontrollable variables that are highly correlated with the time in which they occur. In such a situation, one possibility is to randomize the run order of the experiment. Another possibility is to use a...
Persistent link: https://www.econbiz.de/10002570189
Shear forming is a versatile process for manufacturing complex lightweight components which are required in increasing numbers by many different industries. Inherent advantages of the process are simple tooling, low tool costs, good external and internal surface quality, close dimensional...
Persistent link: https://www.econbiz.de/10003085110
Persistent link: https://www.econbiz.de/10002141613
Persistent link: https://www.econbiz.de/10002363473