This paper analyzes the Steiner-Weber-Problem with piecewise linear or piecewise constant transportation costs. These non-differentiable cost functions are analyzed using different one-step and dynamic linearization methods, which are based on approximations via average and marginal costs. An...
Persistent link: https://www.econbiz.de/10010264939
This paper presents a linear programming approach to analyze and optimize flow lines with limited buffer capacities and stochastic processing times. The basic idea is to solve a huge but simple linear program that models an entire simulation run of a multi-stage production process in discrete...
Persistent link: https://www.econbiz.de/10010264940
In this paper, we analyze the performance of call centers of financial service providers with two levels of support and a time-dependent overflow mechanism. Waiting calls from the front-office queue flow over to the back office, if a waiting-time limit is reached and at least one back-office...
Persistent link: https://www.econbiz.de/10010264946
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10010270043
This paper treats the problem of setting the inventory level and optimizing the buffer allocation of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a very large but simple linear program that models an entire simulation run of a closed-loop flow...
Persistent link: https://www.econbiz.de/10010421360
Persistent link: https://www.econbiz.de/10015166300
Warehouses recently face increasing stress imposed by a volatile customer demand and increasing customer expectations in terms of ever shorter order response times. In that respect, warehouses more and more offer same-day and next-day shipment conditions. However, same-day shipment promises are...
Persistent link: https://www.econbiz.de/10015333190
The "Capacitated lot sizing problem with setup carry-over" is based ort the well known "Capacitated lot sizing problem" and incorporates the possibility of preserving a setup-state from a period to the following. Sox and Gao [2] decompose their formulation of the first one (GCLP1) by Lagrangian...
Persistent link: https://www.econbiz.de/10011558795
Electrifying road-based long-haul transportation is an intricate task. Given the current state of battery technology, either the driving ranges of electric commercial vehicles (ECVs) are too short or high-capacity batteries are costly and so heavy that payloads are limited. An old, yet recently...
Persistent link: https://www.econbiz.de/10015209765
Single machine scheduling with sequence-dependent setup times is one of the classical problems of production planning with widespread applications in many industries. Solving this problem under the min-makespan objective is well known to be strongly NP-hard. We consider a special case of the...
Persistent link: https://www.econbiz.de/10014501705